Thomas Surrer

Plans in the homeland of cable cars

Uncategorized|

Ropeways are inextricably linked to Switzerland, shaping the country‘s image as a destination for sports and nature. However, the urban variant has struggled to gain a foothold. Nevertheless, several projects are underway, some of which are already quite far along.

Urban ropeways: From concept to implementation

Uncategorized|

Urban infrastructure projects require solid preparation and planning, yet for ropeways in particular, this is often ignored. Ideas are frequently presented to the public without first verifying which mobility needs are actually being met and what the impact of these improvements will be. The successfully implemented “Câble C1“ project near Paris demonstrates how to do it right.

Toulouse: More efficent maintenance for maximum availability

Cities|

Time and safety – these are the critical factors in the maintenance of urban ropeways. The time windows are tight in order not to interrupt operations longer than necessary. With a great deal of expertise and internally developed tools, the French manufacturer POMA has optimized the maintenance of ropeways. The best current example is the track rope relocation on the “Téléo“ in Toulouse.

Go to Top